• MAHUA HARBOUR_01
  • MAHUA HARBOUR_02
  • MAHUA HARBOUR_03
  • MAHUA HARBOUR_04
  • PORTO ALEGRE

    2008
    REMODELING OF PORTO ALEGRE’S WATERFRONT

    LOCATION
    PORTO ALEGRE, BRASIL

    STATUS
    SCHEMATIC DESIGN

    AREA
    140.000 sqm

    CLIENT

    SECRETARY OF STATE FOR DEVELOPMENT AND
    INTERNATIONAL AFFAIRS, RIO GRANDE DO SUL STATE

    GENERAL CONTRACTOR
    CONSTRUCCIONES Y COMERCIO CAMARGO CORREA

    COMPANY

    B720 ARQUITECTOS
    JAIME LERNER ARQUITECTOS ASOCIADOS

    AUTHORS
    FERMÍN VÁZQUEZ, JAIME LERNER

    PROJECT TEAM

    PECO MULET, JUAN PABLO PORTA, IVAN ARELLANO, LEONARDO NOVELO, NICOLÁS PERFUMO, ORIOL ROIG, SARA SANTOS, ALESSANDRO ZANCHETTA

    The transformation of the Cais Mauá includes interventions in 2,5 km of coastal highway and 258.000m² of built area. Additionally, the transformation of the old fish market into a thematic recreational and commercial zone eliminates the existing barrier between the city and the waterfront. The large new buildings are situated at the ends of the site: two office towers at one end, and a hotel, exhibition hall, and commercial center at the other.

    The rehabilitation of the Cais Mauá makes possible the introduction of large singular buildings which exist in harmony with the existing city, strengthening the image of a centralized urban area. Special efforts were made to connect the city center with the docks, thus mending the new torn urban fabric in the surrounding neighbourhood of la laguna Guaíba. Thus, the organic and fluid plazas of the docks are allowed to enter into the existing rigid city grid of La Guaíba. The open areas are reserved for pedestrian traffic, with careful landscaping treatment that includes protected green areas, building access routes, and parking zones.